- Admin
- #1
Constraints are distributed based on Available Days’ Supply (ADS), Controlled Method or Percent of Allocation (POA). Dealers can use the weekly constraint wire to see the basic availability of an option. The percentages on the weekly constraint wire are estimated based on the national retail number of the constrained option divided by the amount of retail orders being allocated for the week.
Chevrolet Constraint Wire for 7/19/07
2008 CORVETTE
Constraint #, Description, National Quantity
00425 4LT Package 0
00428 QX3 Chrome Wheels 0
00444 89U Crystal Red 35
Orders approved this week will be produced between 8/13/07 and 8/19/07
2008 CORVETTE Z06
Constraint #, Description, National Quantity
00448 3LZ Package 0
Orders approved this week will be produced between 8/13/07 and 8/19/07
Chevrolet Constraint Wire for 7/19/07
2008 CORVETTE
Constraint #, Description, National Quantity
00425 4LT Package 0
00428 QX3 Chrome Wheels 0
00444 89U Crystal Red 35
Orders approved this week will be produced between 8/13/07 and 8/19/07
2008 CORVETTE Z06
Constraint #, Description, National Quantity
00448 3LZ Package 0
Orders approved this week will be produced between 8/13/07 and 8/19/07