69MyWay
Well-known member
Okay, the first day of vacation amounted to a ton of windshield time. We started the day taking the headers to the welding shop for the O2 bung, then North of here about an hour to a ceramic coating shop. Then to the UPS place to send out some parts. Back to the house and off to the local speed shop to have the upper inlet hose on the radiator aluminum welded into a 90 degree as it was going to interfere with the left mount a/c system. He was out of stock on the 90 degree 1.5" aluminum tube, so back off to the other side of town to get some from another race shop. Shewwwwwwww. We spent like 4 hours in the truck today.
Okay, enough of that. Here is the current install status. Radiator now in. The headers will be back on Wed or Thursday. I will hammer out the other small details between now and then and go for launch on Thursday.
Okay, enough of that. Here is the current install status. Radiator now in. The headers will be back on Wed or Thursday. I will hammer out the other small details between now and then and go for launch on Thursday.