JonM
Well-known member
I am changing the line that runs from the gas tank to the purge canister. (mine was clogged) There are alot of twists and turns in the steel line that was in the there so it would be nearly impossible to recreate it with steel. I was thinking about going with either Hard Vaccum line tubing or Gas Line tubing. Any pros and cons and any other suggestions on the material I should use? Maybe copper tubing?




