firstgear
Well-known member
- Joined
- Oct 11, 2003
- Messages
- 1,895
- Location
- Norwalk, Ohio
- Corvette
- 15 Z06, 01 Vert, 63 SWC & 60 ALL RED
I plan on going to Carlise, not sure if I will have the '60 ready to go or not....here is a small punch list that needs to be done to take the car.....
X finish front bumper/grill install
X apply glue to dash pad for windshield
X install windshield
X install weatherstripping on soft top lid
X install weatherstripping on deck lid
X mount driver side hockey stick SS trim
X mount rear lid emblem
X install rear lid latch mechanism
X install soft top lid latch mechanism
X install driver door window regulator
X install passenger door window regulator
X install passenger door latch and lock mechanism
X install driver door latch and lock mechanism
X install door catch
X install weatherstripping on hood
X finish wiring the head lights and front turn signals
X install door under carpeting wiring shields
Bakers wire volt meter
X wire gas gage
Bakers wire engine temp
Xwire gage cluster lights to gray wire power for lights
Bakers finish wiring motor
X install hood electric lift mechanism
X finish battery cables
Bakers mount starter
Bakers attach starter wires
X fuel line from supply to fuel rail
X fuel line from rail to return
Bakers locate cylinder number 1 at TDC
Bakers set distributor
Bakers install throttle cable and gas pedal
X rebuild brake and clutch pedal assembly
Bakers install brake and clutch pedal assembly
Bakers install stand off for master cylinder
Bakersinstall master cylinder
Bakers run brake lines from master cylinder to frame pick off points
X install passenger door window post
X install driver door glass
Bakers install steering column and shafts
X install weatherstripping around passenger door
X wire tranny temp sensor
X wire fuel pressure sensor
X wire oil pressure sensor
2/3X install 3 gages into center console
X install tachometer recall buttons
X install passenger door glass
X install passenger door trim around door glass
install temporary lower radiator hose for break in period
X take to Harry for inside hood panels fab and install Monday, August 13th
X check out LED lights
X extend wires
X finish rear red lens install allow time for drying
X mount rear bumpers
X install seat divider door
X install seat divider SS trim
install seat belts
install seats
X install door panels
install kick panels
X install driver door trim around door glass
X install driver door side mirror
install dash pad end trim pieces
X remove and re-install dash insert
X install weatherstripping around driver door
install carpet
install trim around center console upper
install trim around center console lower
install shifter trim and 5 speed plaque
X install window crank driver
X install window crank passenger
install passenger door step plate (2)
install driver door step plate (2)
X install driver door window post
Bakers cut to length and make spark plug wires
Bakers install spark plug wire dress over headers
install stacks
X install LED tail lights
gap and install spark plugs 0.035
install lower radiator hose - Cool Flex
And there is a bunch more stuff I have that is not listed I am sure.....but the list drives us and we are making head way.....
Bakers is the shop I will be using the final 4 days before Carlisle to button up any loose ends and firing the motor and fine tuning it.
X means it is done!
X finish front bumper/grill install
X apply glue to dash pad for windshield
X install windshield
X install weatherstripping on soft top lid
X install weatherstripping on deck lid
X mount driver side hockey stick SS trim
X mount rear lid emblem
X install rear lid latch mechanism
X install soft top lid latch mechanism
X install driver door window regulator
X install passenger door window regulator
X install passenger door latch and lock mechanism
X install driver door latch and lock mechanism
X install door catch
X install weatherstripping on hood
X finish wiring the head lights and front turn signals
X install door under carpeting wiring shields
Bakers wire volt meter
X wire gas gage
Bakers wire engine temp
Xwire gage cluster lights to gray wire power for lights
Bakers finish wiring motor
X install hood electric lift mechanism
X finish battery cables
Bakers mount starter
Bakers attach starter wires
X fuel line from supply to fuel rail
X fuel line from rail to return
Bakers locate cylinder number 1 at TDC
Bakers set distributor
Bakers install throttle cable and gas pedal
X rebuild brake and clutch pedal assembly
Bakers install brake and clutch pedal assembly
Bakers install stand off for master cylinder
Bakersinstall master cylinder
Bakers run brake lines from master cylinder to frame pick off points
X install passenger door window post
X install driver door glass
Bakers install steering column and shafts
X install weatherstripping around passenger door
X wire tranny temp sensor
X wire fuel pressure sensor
X wire oil pressure sensor
2/3X install 3 gages into center console
X install tachometer recall buttons
X install passenger door glass
X install passenger door trim around door glass
install temporary lower radiator hose for break in period
X take to Harry for inside hood panels fab and install Monday, August 13th
X check out LED lights
X extend wires
X finish rear red lens install allow time for drying
X mount rear bumpers
X install seat divider door
X install seat divider SS trim
install seat belts
install seats
X install door panels
install kick panels
X install driver door trim around door glass
X install driver door side mirror
install dash pad end trim pieces
X remove and re-install dash insert
X install weatherstripping around driver door
install carpet
install trim around center console upper
install trim around center console lower
install shifter trim and 5 speed plaque
X install window crank driver
X install window crank passenger
install passenger door step plate (2)
install driver door step plate (2)
X install driver door window post
Bakers cut to length and make spark plug wires
Bakers install spark plug wire dress over headers
install stacks
X install LED tail lights
gap and install spark plugs 0.035
install lower radiator hose - Cool Flex
And there is a bunch more stuff I have that is not listed I am sure.....but the list drives us and we are making head way.....
Bakers is the shop I will be using the final 4 days before Carlisle to button up any loose ends and firing the motor and fine tuning it.
X means it is done!