- Admin
- #1
Constraints are distributed based on Available Days’ Supply (ADS), Controlled Method or Percent of Allocation (POA). Dealers can use the weekly constraint wire to see the basic availability of an option. The percentages on the weekly constraint wire are estimated based on the national retail number of the constrained option divided by the amount of retail orders being allocated for the week.
Chevrolet Constraint Wire for 9/6/07
2008 CORVETTE
Constraint #, Description, National Quantity
00422 1LT Package 300
00425 4LT Package 240
00444 Crystal Red Met 0
Orders approved this week will be produced between 10/1/07 and 10/7/07
2008 CORVETTE Z06
Constraint #, Description, National Quantity
00448 3LZ Package 74
Orders approved this week will be produced between 10/1/07 and 10/7/07
Chevrolet Constraint Wire for 9/6/07
2008 CORVETTE
Constraint #, Description, National Quantity
00422 1LT Package 300
00425 4LT Package 240
00444 Crystal Red Met 0
Orders approved this week will be produced between 10/1/07 and 10/7/07
2008 CORVETTE Z06
Constraint #, Description, National Quantity
00448 3LZ Package 74
Orders approved this week will be produced between 10/1/07 and 10/7/07