- Admin
- #1
Weekly Constraint/Production News - UPDATED
Constraints are distributed based on Available Days’ Supply (ADS), Controlled Method or Percent of Allocation (POA). Dealers can use the weekly constraint wire to see the basic availability of an option. The percentages on the weekly constraint wire are estimated based on the national retail number of the constrained option divided by the amount of retail orders being allocated for the week.
Chevrolet Constraint Wire for 8/27/09
2010 CORVETTE
Constraint #, Description, National Quantity
00330 70U Torch Red Exterior National quantity 0
00684 Crystal Red Paint/Convert National quantity 0
00797 GS Heritage Pkg with 2LT National quantity 0
00798 GS Heritage Pkg with 3LT or 4LT National quantity 0
Orders approved this week will be produced between 10/5/09 and 10/11/09
Constraints are distributed based on Available Days’ Supply (ADS), Controlled Method or Percent of Allocation (POA). Dealers can use the weekly constraint wire to see the basic availability of an option. The percentages on the weekly constraint wire are estimated based on the national retail number of the constrained option divided by the amount of retail orders being allocated for the week.
Chevrolet Constraint Wire for 8/27/09
2010 CORVETTE
Constraint #, Description, National Quantity
00330 70U Torch Red Exterior National quantity 0
00684 Crystal Red Paint/Convert National quantity 0
00797 GS Heritage Pkg with 2LT National quantity 0
00798 GS Heritage Pkg with 3LT or 4LT National quantity 0
Orders approved this week will be produced between 10/5/09 and 10/11/09