Thanks Mikey, one other question, I have replace rocker channel on pass side and should of gotten the one piece channel insert that also goes up in the pillar ( up in behind #2 kick panel). My thought is if I can mybe drill some holes and plug weld in reinforcement piece from Zip ( zip has front channel insert that goes from #2 body mount to #1 with the pillar post insert attached) cut off and save pillar post insert to use. I think the tricky part is drilling through the bottom of pillar post to plug weld, any other thoughts thanks ,Bob.