- Thread starter
- #21
- Joined
- Mar 18, 2002
- Messages
- 934
- Location
- Westchester,New York
- Corvette
- 1989 Callaway Twin Turbo Aerobody Coupe
Callaway work
UPGRADED WONDERBAR Single Mass Clutch setup Ron Davis Radiator New fuel pump sending unit gas tank All injectors flowed and ultrasonicly cleaned new computer programing Wastegate valve modified Larger Size . Turbos taken apart and checked New dual exhaust with Xpipe 2.75 inch dia. with MEGAPHONES Tune up all fluids changed Waiting for word on a Rollbar and Seatbelts. I am probably forgetting somethings but as you can see I am having alot of work being done.I look forward to seeing the car that was built right after mine see you in Bloomington. Peter
UPGRADED WONDERBAR Single Mass Clutch setup Ron Davis Radiator New fuel pump sending unit gas tank All injectors flowed and ultrasonicly cleaned new computer programing Wastegate valve modified Larger Size . Turbos taken apart and checked New dual exhaust with Xpipe 2.75 inch dia. with MEGAPHONES Tune up all fluids changed Waiting for word on a Rollbar and Seatbelts. I am probably forgetting somethings but as you can see I am having alot of work being done.I look forward to seeing the car that was built right after mine see you in Bloomington. Peter
kruzmisl said:Peter, any update on your car, still there or do you have it back? Want to fill me in on the total menu of work. I'm jealous!