Using the Vanguard PEX Tubing with a 3 Zone Manifold...
I have (2) 6-mil Layers of Plastic and 2" of Poly Blueboard Insulation under the Concrete (4,000) Slab which will be approximately 8 Inches thick with Fiberglass strands imbedded within the Concrete. I have the Mesh layed down for extra support, but is not needed here as we have NO CODE (only Electrical)...
This Garage is near my home, so will only be used for my Vette Project and also for performing maintenance to my vehicles. I also will be doing some painting and will have a "New" Crossflow Ventilation System which I have designed. Main heat will be Propane. This is the reason behind the Hydro Floor Heating as the Propane Heat will be shut down prior to painting, so we need heat...
The Main Garage elsewhere on my Property (which will be started in Spring, 2004), will be 60 x 100 and will be used for our Business (Outlaw Kustoms) which deals with Kustomizing, Painting, Powdercoating, and new to come by July, 2004, all Aspects of Plating...