another good day on the project.
Got the drive shaft installed along with the top of the spare tire carrier and gas tank, new master cylinder and new coolant control valve.
Most important we finally got the rear bumper mount brackets repaired and straightened out. The frame we are using must have been tapped in the rear at some point and the bumper mount brakets were a bit bent and we had to straighten them out so with some heating and persuasion we got those bracket tabs straight again.
We ran out of time today so didn't have time to do the body drop but we will finally get the body back on the rolling chassis. Because of our various schedules we aren't going to be able to work on the car next Sunday but the following week we will get the body dropped on the chassis and than another one or two working Sundays and the car should be running again and ready to go home.
Here are the pics from today:
http://www.vetteclub.org/1980_Project/projectpics9.html
Got the drive shaft installed along with the top of the spare tire carrier and gas tank, new master cylinder and new coolant control valve.
Most important we finally got the rear bumper mount brackets repaired and straightened out. The frame we are using must have been tapped in the rear at some point and the bumper mount brakets were a bit bent and we had to straighten them out so with some heating and persuasion we got those bracket tabs straight again.
We ran out of time today so didn't have time to do the body drop but we will finally get the body back on the rolling chassis. Because of our various schedules we aren't going to be able to work on the car next Sunday but the following week we will get the body dropped on the chassis and than another one or two working Sundays and the car should be running again and ready to go home.
Here are the pics from today:
http://www.vetteclub.org/1980_Project/projectpics9.html